Pipejacking and Microtunnelling

Pipejacking and Microtunnelling are a technique used for installing underground pipelines, ducts and culverts from launch shafts to reception shafts. Normally installations of less than 900mm internal diameter are described as a Microtunnel, with larger diameters being categorized as Pipejacks. The method comprises powerful hydraulic jacks pushing off a substantial back thrust wall, used to push specially designed pipes through the ground at the same time as excavation is taking place from within a shield at the front of the pipeline. The method provides a finished pipeline as the tunnel is excavated.

The line and level of any installed Microtunnel or Pipejack by Euro Iseki Overseas ( Thailand ) Ltd is controlled by a laser guidance system ensuring a high degree of engineering accuracy. Clients will usually specify tolerances of 50mm for line and level.

Excavation is normally mechanised but can be manual for shorter lengths or in specific circumstances. Euro Iseki Overseas ( Thailand ) Ltd currently has 18 full-faced mechanized Iseki tunnelling systems in Thailand ranging from 250mm to 3000mm in diameter. The systems available include :-

Slurry Pressure Balance - slurry muck handling

Earth Pressure Balance - solid muck pumping

Earth Pressure Balance - solid muck auger handling

The Company is also able to draw upon the different machines and configurations from the worldwide Iseki fleet of tunnelling machines.

The unique combination of Contractor and Manufacturer and constant development allows for numerous hybrid adaptations to be made to ensure machines best suit individual contract requirements.

Euro Iseki Overseas ( Thailand ) Ltd from its worldwide experience offers success and confidence to its Clients with unique skills and knowledge of soils, design of jacking shafts, pipe design, shield design, hydraulic and laser engineering together with muck/slurry management.

Euro Iseki Overseas ( Thailand ) Ltd introduced and developed into the Thailand market with Iseki Polytech Inc innovative microtunnelling machines and methods specifically for performance to their ultimate in the soft clays present in Bangkok. A similar approach is taken to projects wherever there location.


Applications

The Pipejacking and Microtunnelling systems can be utilised for installation of the following :-
Wastewater Pipes
Water Mains including Pressure Pipes
Electricity Ducts
Telecommunication Ducts
Gas or Oil Pipelines
Construction of Underground Walkways
Any underground pipe / culvert that requires accurate
  installation from 250mm to 3000mm diameter as a
  norm and larger in exceptional circumstances.



Microtunnelling | Shaft Construction | Tunnel Construction | CCTV | Pipejacking Applications | Consultation | Completed Projects | Our Locations | Contact Us

Copyright @ 2001 Euro Iseki Overseas ( Thailand) Ltd. All rights Reserved
Web Design by E-Web Solutions Ltd.