Examples of Project Details of EIOTL works in Bangkok


1. Bangkok Wastewater Project Stage 1 - Pipejacking Works

Client
Bangkok Metropolitan Administration
Main Contractor
NOSS Consortium
Workscope
17.4 Kilometres of Pipejack (600mm diameter upto 1800mm diameter)
   

2. Bangkok Wastewater Project Stage 1 - Interceptor Sewer Package 1

Client Bangkok Metropolitan Administration
Main Contractor NOSS Consortium
Workscope 6.8 Kilometres of Pipejack (450mm diameter upto 800mm diameter)
  Construction of 200 nr Shafts
  Construction of 60 nr Interceptor Chambers
   

3. Bangkok Wastewater Project Stage 2

Client Bangkok Metropolitan Administration
Main Contractor Nawarat Patanakarn Public Co., Ltd.
Workscope 14.0 Kilometres of Pipejack (300mm diameter upto 1000mm diameter)
   

4. MEA Duct Petkasem Road

Client Metropolitan Electricity Authority
Main Contractor Nawarat Patanakarn Public Co., Ltd.
Workscope 1000m of 1500mm diameter Pipejack
   

5. MEA Duct Rama II

Client Metropolitan Electricity Authority
Main Contractor Italian Thai Development Pcl
Workscope 500m of 1500mm Diameter Pipejack
  250m of 1200mm Diameter Pipejack
   

6. Pumping Main Sukhumvit Soi 36

Client Bangkok Metropolitan Administration
Main Contractor Italian Thai Development Pcl
Workscope 1200m of 1800mm Diameter Pipejack
  (800 metres installed in curved drives)
   

7. Samut Prakarn Wastewater Project

Client Pollution Control Department
Main Contractor NVPSKG/Nippon Comsys Corporation
Workscope 22 KM of Pipejacking
  (300mm diameter upto 1500mm Diameter)
  180 No. Shafts
  (2.0m Diameter upto 6.5m x 3.8m)
   